Quality reporting
Quality evidence, built from the record.
The proof of quality is already flowing through the group chat: the poured pours, the signed checks, the photos of the rebar before it disappeared. Quality reporting will draw those together into inspection tracking, non-conformances and a clean sign-off trail, so the evidence assembles itself instead of being chased at handover.
Coming soon · on the roadmap, not yet live
What you get
What it will do
ITP tracking
Follow every Inspection and Test Plan item from open to closed, with the hold and witness points that gate the next stage of work.
Non-conformances (NCRs)
Raise an NCR with the photos and messages that show it, assign an owner, and close it out with the evidence of the fix attached.
A clear sign-off trail
Who checked what, when, and against which spec. A contemporaneous approval record, not a memory test at the end of the job.
Tied to the tamper-evident record
Every quality item points back to the original message, photo or document it came from, kept on the same auditable record as everything else.
A quality pack, exported
Produce a quality pack for the client or principal contractor on demand, in your branding, without rebuilding it by hand.
Searchable and yours
Find any check, any NCR, any sign-off in seconds, and export all of it whenever you want it.
How it works
How it will work
Capture as normal
The team keeps sending photos and updates to the group chat, exactly as they do today.
Flag the quality moments
Checks, pours and inspections are recognised and filed against the right plan and day.
Track to close-out
Open items, hold points and NCRs are tracked until they are signed off.
Export the pack
A quality record for the project, ready to hand over whenever it is asked for.
Not switched on yet, and we will say so. This is on the roadmap, not live today. What is live is the tamper-evident record it will build on: every message, photo and document, filed to the right day and person. Quality reporting sits on top of that when it lands.
Want quality reporting on your projects?
Tell us how you evidence quality today and what would save you the most time. It shapes what we build first.
