Skip to content
Construction Metric

Concrete Cube Tracker

The cube register that fills itself in.

Drop the delivery ticket, the cube request or the lab certificate into the browser and the register updates itself: pour, mix, cubes, dates and results, without anyone retyping a spreadsheet. It flags what looks wrong and predicts 28-day strength from the early results, so a bad pour is a conversation this week rather than a surprise in a month. Free for concrete suppliers and subcontractors.

Free for concrete suppliers and subcontractors · launching this week

What you get

What it does

Reads the paperwork you already have

Delivery tickets, cube request forms, lab certificates, pour records, or the Excel register you keep today. Drop them in; the fields are extracted and shown for a quick check, not retyped.

A register, not a spreadsheet

Every pour and every cube in one live register: searchable, filterable, exportable back to Excel or PDF whenever a client asks for the old format.

Flags what looks wrong

Duplicate tickets, a mix that does not match the pour, missing cube numbers, missing slump, a 7-day result that is off the pace. Raised as a suggestion with a one-click fix, not a red error.

Predicts the 28-day result

Early results project forward, so a cube that is likely to fail is flagged weeks before the lab confirms it. Predictions are an early warning; the lab certificate stays the record.

Reports ready to issue

The cube register, the weekly QA summary and the strength trend, formatted and dated, exported in one click when the engineer or the client asks.

Built for the supply chain

For the ready-mix supplier proving performance and the subcontractor placing the concrete, not just the main contractor QA department.

How it works

How it works

01

Drop the paperwork in

Drag PDFs, photos of tickets, or your existing Excel register into the browser.

02

Check the extraction

The fields it read are shown with anything uncertain highlighted for a ten-second check.

03

The register updates itself

Pours, cubes, dates and results file into the live register, and anomalies are flagged as they land.

04

Get ahead of the failures

Early strengths project to 28 days, so the mix conversation with the supplier happens before the next pour, not after it.

Free, and why. The cube tracker is free for concrete suppliers and subcontractors because cube records belong in the same place as the rest of the site record, and once your register runs itself you will know exactly what the rest of Construction Metric does all day. Predictions are estimates from early-age results and history: they are an early warning to act on, never a substitute for the certified 28-day test. The lab certificate remains the record.

Retyping cube results into Excel this week?

Send us one delivery ticket and your current register, and watch both land in a register that keeps itself. Free for concrete suppliers and subcontractors importing concrete.